• Key areas affected include Charar-i-Sharief, Chadoora, Nagam, Zirpora, Khiram, Nishat, BB Cantt, Sonwar, Watergam, and others
  • KPDCL to undertake crucial works for line construction, transformer commissioning, and preventive maintenance; temporary power supply interruptions notified.

SRINAGAR: According to the Chief Engineer, Distribution, KPDCL, in order to carry out the work of construction of 33 KV Nowbugh Khanda line from GSS Nowbugh via Kuzwara Gowherpora, shutdown of 33KV Nowbugh-Nagam line shall be observed due to which 33/11KV Receiving Stations at Char-I, Char-II, Hafroo and Nagam shall remain off while power supply to Kakawring, Yousmarg, Charisharief, Rakhayee, Tilsera, Badipora, Nagam, Hayatpora, Hafroo, Bizgo, Loolipora and adjoining areas will be affected from 06:00 AM to 014:00 PM on 19 July, 2025.

In this connection, shutdown of 33KV Nowbugh-Chadoora line shall be observed due to which 33/11KV Receiving Stations at Chadoora, Panzan, Ranger, Wathoora shall remain off while power supply to Sogam, Repora, Dawlatpora, Panzan, Lalgam, Chadoora, Chadoora Hospital, Wathoora, Bugam and adjoining areas will be affected from 06:00 AM to 014:00 PM on 19 July, 2025.

Also, in order to carry out the completion of pending works related to commissioning of additional 6.3 MVA Power Transformer installed at Zirpora, shutdown of 33KV Zirpora Tap line shall be observed due to which 33/11KV Receiving Stations at Zirpora, Cheniwudar shall remain off while power supply to Srigufwara, Bewoora, Kanelwan, Darigund, Thajiwara, Dupatyar and adjoining areas will be affected from 08:00 AM to 02:00 PM on 19 July, 2025.

Besides to facilitate preventive maintenance of the Khiram Tap line and Receiving Station Khiram, shutdown of 33KV Khiram Tap line shall be observed due to which 33/11KV Receiving Stations at Khiram shall remain off while power supply to Mehand, Khiram, Sirhama and adjoining areas will be affected from 08:00 AM to 02:00 PM on 19 July, 2025.

Further to carry out Maintenance work of 33 KV O/H Centaur Back up line near Botanical Garden and pruning of hugely outgrown tree branches outside Cheshmashahi Grid, shutdown of 33KV TRC line shall be observed due to which no Receiving Station shall remain off and power supply to none of the areas shall remain affected.

Also in this connection, shutdown of 33KV Centaur-Buchwara line shall be observed due to which 33/11KV Receiving Stations at Centaur & Buchwara shall remain off while power supply to Mammer Zabarwan Park, Centaur Hotel, SKICC, Nehru Park, Dalgate, Dal and adjoining areas will be affected from 08:00 AM to 10:00 AM on 19 July, 2025.

Similarly, the shutdown of 33KV Brein-Nishat line shall be observed due to which 33/11KV Receiving Stations at Brein-Nishat, PHE Dal Bandh shall remain off while power supply to Brein, Tulip Garden, Brein Phallo, Taj Vivanta, BSNL Exchange, Nishat, Foreshore road, Pathan Bagh and adjoining areas will be affected from 08:00 AM to 10:00 AM on 19 July, 2025.

Further, the shutdown of 33KV Centaur-BB Cant. Tap line shall be observed due to which 33/11KV Receiving Station at BB Cant. shall remain off while power supply to BB Cant.will be affected from 07:00 AM to 01:00 PM on 19 July, 2025. 

Meanwhile, in order to carry out Branch cutting and preventive maintenance of 33 KV Pampore-Badamibagh line, shutdown of 33KV Pampore Badamibagh line (Sonwar Tap line) shall be observed due to which 33/11KV Receiving Station at Sonwar shall remain off while power supply to Batwara, Shivpora, Indranagar, Badamibagh (Partial) and adjoining areas will be affected from 08:00 AM to 12:00 Noon 21 July, 2025.

Also to carry out works under RDSS Scheme and other maintenance works, the shutdown of 33KV Amargarh Watergam line shall be observed due to which 33/11KV Receiving Stations at Watergam, Hachipora, Hadipora shall remain off while power supply to Watergam, Dangiwach, Hachipora, Hadipora and adjoining areas will be affected from 08:00 AM to 01:00 PM on 19 July, 2025.  

In loving memory of Dr. Priya Ranjan: A mentor who treated me like family
A Profound Loss: JK Monitor Mourns the Passing of Founding Chairman Dr. Priya Ranjan

We at JK Monitor are profoundly saddened by the sudden demise of our Founding Chairman, Dr. Priya Ranjan.IN LOVING MEMORY Dr Priya Ranjan

A brilliant mind who studied at Netarhat Residential School and graduated in Electrical Engineering from IIT Kharagpur before earning his PhD from the University of Maryland, Dr. Ranjan chose to return to India and dedicate his life to teaching, research and social good.

His pioneering work in networked systems, AI, robotics and biomedical applications—especially computer-vision tools for early detection of cancer and heart disease—reflected his deep belief that advanced technology must serve humanity.

For more than 15 years at JK Monitor, he remained a loyal friend, mentor and collaborator, marked by rare humility, intellectual integrity and quiet generosity. His passing leaves a void that cannot be filled. Priya, you will be deeply missed. Your life continues to remind us that knowledge finds its highest purpose in the service of others.

— Team JK Monitor

       LOOK_HERE.jpg Esteemed readers, for your convenience, we have categorized our news publishing into following 👇

Your voice can reach the world: At JK Monitor, we firmly believe that every well-researched idea has the power to inspire change beyond geographical boundaries. We are delighted to share an encouraging message from one of our esteemed contributors, Dr. Rakesh Verma (J&K Forest Services). “His article, ‘When Trees Become Rights-Bearing Citizens: A Lesson from Canada for India’s Ecological Future,’ published on JK Monitor, received appreciation from La Compagnie des Papillons Bleus, the French non-profit organisation that founded and promotes the Universal Declaration of Tree Rights.”.  Read the message here