- Residents of Pouni, Shivkhori, Dadua, Bharakh, Ransoo, Nandpur, Ramgarh, SM Pura, BSF, Vijaypur Ist, and adjoining areas advised to plan accordingly during specified hours
JAMMU: Chief Engineer (Distribution) JPDCL Jammu has informed that the power supply to Pouni, Shivkhori, Dadua, Bharakh, Ransoo and adjoining areas will remain affected on February 14, 16 and 19 from 9 am to 4 pm.
Superintending Engineer, (Distribution) JPDCL O&M Circle Kathua has informed that the power supply to Nandpur-1, Nandpur-2 and adjoining areas will remain affected on February 14 and 16 from 8 am to 2 pm.
Similarly, the power supply to Ramgarh and adjoining areas will remain affected on February 14 from 8 am to 1 pm. Likewise, the power supply to SM Pura, BSF and adjoining areas will remain affected on February 14 and 16 from 8 am to 1 pm. Similarly, the power supply to Vijaypur Ist and adjoining areas will remain affected on February 14 from 8 am to 1 pm.